Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


Most reservoir engineers exploit material balance thinking which is based on long-term well-by-well flow rates surface flowrate targets  (where whether producers or injectors).

In practice, the flow rate flowrate targets are closely related to bottomhole pressure and associated limitations and require a specialised analysis to set up the optimal lifting parameters. 

...