Pressure transient survey in injector during the pressure rise period caused by opening well for injection or increasing its injection rate

 (see Fig. 1):




Fig 1. Drawdown pressure decline (blue dots) for 2,300 hrs after opening the well for production at 100 m3/d.


Interpretation



Interpretation of DD is based on:


Fig. 1PTA Diagnostic Plot for vertical well in single-layer homogeneous reservoir with impermeable circle boundary (PSS).

Gauge pressure is in blue and log-derivative is in red.

Fig. 2Pressure diffusion model fitting to pressure gauge data.

Gauge pressure is in blue and log-derivative is in red.

Simulated pressure and log-derivative are in grey dash line.


See Also


Petroleum Industry / Upstream / Subsurface E&P Disciplines / Well Testing / Pressure Testing

Pressure Transient Analysis (PTA) ]Pressure Build-Up (PBU) = Build-Up Survey (BUS) ][ Drawdown survey (DD) ]