Pressure transient survey in producer during the pressure fall period caused by opening well for production or increasing its production rate
(see Fig. 1):
Fig 1. Drawdown pressure decline (blue dots) for 2,300 hrs after opening the well for production at 100 m3/d.
Interpretation of DD is based on: