Pressure transient survey in producer during the pressure fall period caused by opening well for production or increasing its production rate

 (see Fig. 1):


Fig 1. Drawdown pressure decline (blue dots) for 2,300 hrs after opening the well for production at 100 m3/d.


Interpretation



Interpretation of DD is based on: