p(t)  = p_i + \frac{\Delta Q(t)}{V_e \cdot c_t}

where

Cumulative Voidage Replacement Balance (CVRB) 

initial drainage volume of the main pay (excluding the aquifer and gas cap)

initial porosity

total compressibility

pore compressibility 


initial water saturation

initial gas saturation

initial oil saturation:

fluid compressibility of water phaseoil phase and gas phase

See Also


Petroleum Industry / Upstream /  Production / Subsurface Production / Field Study & Modelling / Production Analysis / Material Balance Analysis (MatBal) / Material Balance Pressure @model