...
The maximum volume of Oil Initial In Place (OIIP) which is assumed by the current Field Development Plan (FDP) as being possible to be recovered with positive profitability:
STOIIP = EUOR + Non-recoverable Oil Reserves
...
...
The maximum volume of Oil Initial In Place (OIIP) which is assumed by the current Field Development Plan (FDP) as being possible to be recovered with positive profitability:
STOIIP = EUOR + Non-recoverable Oil Reserves
...