Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The effect often creates a confusion during the Pressure Build Up Surveys and leads to the wrong estimation of the actual rformation pressure (see Fig. 1).


Fig. 1. A sample fo of a Gas Hump during the BUS after 1,000 hrs of constant rate production.

If the BUS period has been < 24 hours it may easily mislead an analyst with the much higher than actual formation pressure estimation.

...