Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Hoist-aided well Intervention. 

Completion-orientatedReservoir-orientatedReactivationAbandonment
Borehole cleaningMillingWater Shut-off (WSO)

FishingCement recoverySelective Stimulations

Replacing pumpBottomhole drillingSwitching to another pay

Replacing tubingPulling down extra casingConversion (producer → injector)

Replacing packerRemoving the casingConversion (injector→ producer)

Installing a bridge plug



Setting up the tubing/casing patch

`
Pumping corrosion inhibitors



Installing the gravel pack



Setting up the bottom hole cement plug




See Also

...

Petroleum Industry / Upstream /  Production / Subsurface Production / Well & Reservoir Management / Well Intervention

[ Subsurface E&P Disciplines / Workover Engineering ]

Well ]


Show If
groupeditors
Panel
bgColorpapayawhip
Expand
titleEditor

Типы ремонтов



Капитальный ремонт

Подземный ремонт


Цели ремонтов



Ликвидация


Реликвидация


Ремонт скважиной подвески

Смена насоса

Смена трубок

Смена пакета

Установка летучки

Установка механического патча

Установа искуственного забоя

Углубление забоя

Спуск дополнительной колонны

Восстановление цемента за колонной

Внедрение ингибиторов коррозии

Установка гравийного фильтра 

Демонтаж эксплуатационной колонны


Работа с пластами


РИР

Селективная стимуляция

Перевод на другой объект

Перевод под закачку