Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.



Excerpt

Pressure transient survey in producer during the pressure rise period caused by shutting well down or reducing its production rate

(see Fig. 1):


Fig 1. Horner test procedure


Interpretation



Interpretation of BUS is based on: