Workflow
...
- Check the current production rate against the production target from FDP
- If the diffference is big enough to justify the cost of production optimization (see point 8 below) then proceed to the step 3 below
- Assess formation pressure based on well tests
- Simulate IPR/OPR based on the current WOR/GOR
- Calculate the stabilized flow bottom-hole pressure
- Gather the current bottom-hole pressure
LaTeX Math Inline body p_{wf} - Check up the calculation aganst the actual
LaTeX Math Inline body p_{wf} - Recommend the production optimisation activities to adjust bottom-hole pressure
:LaTeX Math Inline body p_{wf} - adjusting the choke at surface
- adjusting the pump settings from surface
- changing the pump depth
- changing the tubing size
- changing the pump
- adjusting the choke at surface
...