  1. Check the current production rate against the production target from FDP

  2. If the diffference is big enough to justify the cost of production optimization (see point 8 below) then proceed to the step 3 below

  3. Assess formation saturation in pay zones pressure based on well tests
    Assess formation pressure based on well tests
  4. Simulate IPR/OPR based on the current WOR/GOR

  5. Calculate the stabilized flow bottom-hole pressure

  6. Gather the current bottom-hole pressure
    LaTeX Math Inline
    bodyp_{wf}


  7. Check up the calculation aganst the actual 
    LaTeX Math Inline
    bodyp_{wf}


  8. Recommend the production optimisation activities to adjust bottom-hole pressure 
    LaTeX Math Inline
    bodyp_{wf}
    :

    • adjusting the choke at surface

    • adjusting the pump settings from surface 

    • changing the pump depth

    • changing the tubing size

    • changing the pump

The above workflow is very simplistic and assumes single-layer formation with no cross-flow complications.

In practise, the WFP analysis is often very tentative and production technologists spend some time experimenting with well regimes on well-by-well basis. 