...
Metric name | Diagnostic plots | Objectives | |||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Production History Map | Background = STOIIP & Structure Bubbles = qo, qg , qw, qinj ,Number = VRR, Pe over STOIIP & Structure | Production Distribution Overview |
| |||||||||||||||||||||
2 | Recovery Map | Background = STOIIP & Structure Bubbles = Qo, Qg , Qw, Qinj ,Number = VRR, Pe over RF & Structure | Recovery Distribution Overview |
| |||||||||||||||||||||
3 | Production History Graphs | Left Axis = qo, qg , qw, qinj, Rigth Axis = Yw, Yg, Pe , Np, Ninj vs timeHor Axis = Elapsed Time | Production History Overview |
| |||||||||||||||||||||
4 | Decline Curve Analysis | Left Axis = qo1, qliq1, qinj1, Rigth Axis = Yw, Yg, VRR, Pe vs time Hor Axis = Elapsed Time | Production Forecast | ||||||||||||||||||||||
5 | Recovery Diagnostic | Left Axis = qo1, qliq1, qinj1 Rigth Axis =, Yw, Yg, VRR, Pe, Pem Hor Axis = vs RF | Estimate recovery efficiency and pressure decline | ||||||||||||||||||||||
6 | Watercut Diagnostic | Left Axis = Yw, Ywm vs Hor Axis = qliq | Check for water balance and thief water production |
| |||||||||||||||||||||
7 | GOR Diagnostic | Left Axis = Yg, Ygm Hor Axis = vs qo | Check for gas balance and thief gas production | ||||||||||||||||||||||
8 | Injection Efficiency Diagnostics | Left Axis = PIR , PIRm vsHor Axis = Yw | Evaluate WI efficiency |
| |||||||||||||||||||||
9 | Well Performance Analysis | Left Axis = Pwf_IPR , Pwf_VLPvs Hor Axis = qo | Check for the optimal production/injection target |
| |||||||||||||||||||||
10 | Productivity Index Diagnostic | Left Axis = JPI, JPIm vs dPHor Axis = dP = Pwf - Pe | Check for PI dynamics |
|
...