Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Specific Production Strategy which Petroleum Asset Team is following including annual schedule, budget allocation and recommendations on:

Economics
NPV and Annual P&L schedule
Production targetsGross Field and/or individual flowrate targets (producers and injectors)
HSESpecific set of safety instructions towards a particular FDP
Recovery MethodsSelecting the recovery strategy
Subsurface facilitiesQuantity/Types (producers, injectors, observers) and completion strategy
Surface facilities

Capacity and tech spec of metering, production gathering, injection, water supply, on-site fluid processing, pipelines and utilisation

Data AcquisitionSelection/Types/Frequency
Field StudiesSelection/Types/Frequency
Well & Reservoir ManagementFinancial, logistical, operational and technological activities towards executing Production targets and HSE



For the newly explored field the FDP is based on primary exploration data package and booked reserves and called Master Development Plan (MDP).


Multi-year production may reveal the need to revise FDP for various reasons:


Excerpt
  • Changes in market conditions (hydrocarbon price volatility, production cost variations, changes in facility, transportation and service logistics, appearance of new service technologies)

  • Changes in corporate economics (variation in corporate discount rate, variation of liability)

  • Changes in Petroleum Asset reserves structure or well/reservoir behaviour revealed during the execution of previous FDP

  • Logistical mistakes of the previous FDP

  • Deviations from previous FDP during production period which had a bulk adverse effect on the Petroleum Asset performance



thus leading to the new FDP called Redevelopment Plan (RDP).


There are basic regulations and guidelines on building MDP and building RDP which are summarised in Field Development Planning Discipline


See also


Petroleum Industry / Upstream /  Production

Subsurface E&P Disciplines / Field Development Planning 

Nodal Analysis ] [  Master Development Plan (MDP)]