Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

@wikipedia


The maximum recoverable volume of Gas Initial In Place (GIIP).

Percentage of Estimated Ultimate Gas Recovery (EUGR) with respect to the Stock-Tank
Unlike 
Gas Initial In - Place (STGIIP):

...

anchor7JZYE
alignmentleft

...

GIIP) which is a geological category, the concept of Estimated Ultimate Gas Recovery (EUGR) depends on FDP and Petroleum Production specifics (recovery method, recovery duration, surface logistics, market conditions and economics). 

See Also

...

Petroleum Industry / Upstream /  Production Subsurface E&P Disciplines / Petroleum Geology /  Petroleum Reservoir / Subsurface ProductionPetroleum Reservoir Fluids / Estimated Ultimate Gas Recovery Initial In Place (EUGR)[ STGIIP ]GIIP)