Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Excerpt

Pressure transient survey in producer during the pressure fall period caused by opening well for production or increasing its production rate

 (see Fig. 1)

...

.


Image Modified

Fig 1. Drawdown pressure decline (blue dots) for 2,300 hrs after opening the well for production at 100 m3/d.



Interpretation

...

Interpretation of DD is based on:



Image Modified

Image Modified

Fig. 1PTA Diagnostic Plot for vertical well in single-layer homogeneous reservoir with impermeable circle boundary (PSS).

...

Gauge pressure is in blue and log-derivative is in red.

Fig. 2Pressure diffusion model fitting to pressure gauge data.

...

Gauge pressure is in blue and log-derivative is in red.

See Also

...

Petroleum Industry / Upstream / Subsurface E&P Disciplines / Well Testing / Pressure Testing Pressure Transient Analysis (PTA)

Pressure Transient Analysis (PTA) ]Pressure Build-Up (PBU) = Build-Up Survey (BUS) ][ Injection survey ]