Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


The Unscheduled flow between two or more subsurface reservoirs connected or between subsurface reservoir and surface connected to each other through through the wellbore.


Usually two different types of cross-flow is differentiated:

...