Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Well condition before pulling down the production casing with a direct exposure of borehole fluid to the surrounding rocks

This well condition existis open-hole well condition exists for a very short period of time while the drilling rig is still on well site and waiting for finalising of open-hole logging procedures