Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Specific Field Development Planning which aims at maximum production acceleration and usually assumes the following principles:

  • drilling producers only
  • reducing BHP in producers to the minimal value
  • increasing THP in injectors to the maximum value


This FDP is usually exercised at the end of the economical production and right before Decomission.

This plan may not be the most economical and reaching the highest recovery.

See also

...

Petroleum Industry / Upstream /  Production

...